How can I get more information about my operations?
We can add columns in the NC operations tree to have more details:
So we can know:
If the verification of the operation has been done
If there are collisions
If a modifier such as a technological point has been added
If there is information to read in the "events" tree
If operation has been done with a method
If the management of the stock has been checked
If the G Code has been generated If the update of the stock has been requested
If the operation is frozen
If the operating has been upgraded (from an old version to the current version)
The time it took TopSolid to calculate the operation