How can I get more information about my operations?

~ 0 min
25-03-2022 48:09

We can add columns in the NC operations tree to have more details:

So we can know:

If the verification of the operation has been done

If there are collisions

If a modifier such as a technological point has been added

If there is information to read in the "events" tree

If operation has been done with a method

If the management of the stock has been checked

If the G Code has been generated If the update of the stock has been requested

If the operation is frozen

If the operating has been upgraded (from an old version to the current version)

The time it took TopSolid to calculate the operation